In the second phase a grandMA2 full-size console will be installed for control. As the shipment of the grandMA2 consoles will not start until 2009 a grandMA full-size series 1 will be used until the new console arrives.
Raymond Yong was the project manager. Desisti Asia Pte delivered the lighting equipment. The electrical contractor was Xin Bao.
(Jim Evans)