RCF elevates Electro Magnetic festival
- Details
In 2019 and for the first time the Electro Magnetic Festival celebrated two nights at Völklinger Ironworks. RCF audio-systems were used on all floors. German event company TRIACS GmbH was responsible for the technical implementation of the main floor.
More than 16,000 people met, dancing to the beats of big names like Carl Cox, Boys Noize or Amelie Lens, making the 2019 edition one of the biggest electro parties in GermanyKey to the event’s success were the PA systems from RCF, used throughout all floors and stages of the festival. TRIACS was responsible for the main floor and implemented a RCF HDL 50-A system. Together with the several production partners, organising company 4 plus 1 Konzerte GmbH around managing director Thilo Ziegler was able to present an event that sets standards.
To reproduce the electro stars’ performances, TRIACS used several RCF modules on the main floor. Two 10 HDL 50-A Line Array Modules (hanging) together with 16 SUB 9007 (sub arc cardioid) were in place as the main PA. Additionally eight HDL 30-A were used as near-fill. Four TT 1-A covered the VIP zone. TT 052-A modules in combination with In-Ear acted as the monitoring for the control rooms (light, laser, video).
Further companies, involved in the festival were Laserfabrik (laser), FOG (SFX), Provisuell (video) and Gebrüder Rende Gerüstbau (rigging), Lux and Fabula, Senad Deumic & Jan Eiserloh (planning) and Gerdon Design (lighting design).
(Jim Evans)