Over 200,000 visitors are expected for this festival, which is located near the historic Petrovaradin Fortress, built high on the banks of the River Danube and offering a stunning view of Novi Sad.
The Exit festival was established in 2000. In 2007 it was awarded the prestigious UK Festival Award for the best festival in Europe for 2007, as voted for by festival-goers from all over the world.
Studio Berar, responsible for the technical organisation for the festival selected Prolyte to provide a large roof system for the main stage at Exit 2008. Prolyte is already established in this region, thanks to the enthusiastic support of Prolyte distributor PSP.
Novi Sad-based sound, video and light engineering and rental company Studio Berar contracted Prolyte to provide the LT roof system. Prolyte engineer Ivo Mulder was flown in to provide training and assistance during set up of the system.
The LT roof system for Exit's main stage measures 25m wide and 15m deep. The clearance is over 14m, leaving enough height for an impressive set of lighting and sound. A total of 8CT towers support the complete roof construction.
Studio Berar has also bought two complete side wing sets, which will not be used during the festival.