Jerry Singleton, MD, comments, "Our move to larger premises brings together under one roof our office staff, warehouse facilities and workshop, allowing us to have instant access to the equipment and respond to requests for dry hire immediately. In addition, we are delighted with the appointment of both Jeff Jones and Phil King who bring to the team a great depth of knowledge and experience.
"Our installation of the pixels in the stadium at the London 2012 Olympics raised our profile considerably and we are continuing to see the benefits of this. We are particularly proud to have provided the generators and electrical services at G8 in 2013."
The Technical Department provide generators, switchgear, transformers, cabling and lighting for events worldwide. What differentiates the company is the ability to provide tailor-made power solutions to clients through their bespoke distribution systems which are built specifically on site to our client's requirements. This cost effective solution provides clients with a high level of flexibility and efficiency to the power supply and equipment supplied on each project.
In addition to supplying power to support short term temporary events, The Technical Department are experienced at installing complex solutions for long term or permanent installs. Equipment is also available for dry hire and can be delivered or collected from their new premises in Guildford.
(Jim Evans)